PDF презентация

News

The realization of the first apartment block in River Park residential complex is completed
24.02.2021
24.02.2021
The realization of the first apartment block in River Park residential complex is completed

The last lot in the first stage apartment block in the River Park urban quarter has been sold. The sale of the commercial property, commissioned in January this year, has been completed. The developer of the first phase is Rechnikov Invest. The partner in realization of the new building is the company “Metrium”.

The office and business center of the River Park urban quarter consists of 378 apartments with a total area of 27,000 square meters. Sales began in January 2017, the last lot was sold in October of this year. During the sale, the price per square meter increased by more than 30%. The commercial facility was commissioned in January 2020. The office and business center includes three sections united by a stylobate. It contains commercial premises and, in particular, a supermarket.

The complex of apartments in the “River Park” city quarter is a rare example of using metal constructions for the construction of similar objects in Russia. This practice is actively used in many countries, but in our country the metal is mainly used for the needs of the defence industry. However, this technology can also be used to build residential buildings, reducing the construction time compared to monolithic and brick structures.

“Construction of buildings on a metal frame basis is faster and easier,” comments Grigory Vaulin, CEO of Ferro-Stroy Group. – In other countries this technology is widely used, but in Russia it is mistakenly associated only with industrial facilities. In fact the metal frame basis can be used in the construction of residential, office buildings and even individual houses. In this case, this technology allows the builder to build even on sites with difficult soils, groundwater close to the surface, as well as to actively expand the range of apartments. Bearing pillars in such buildings are located mostly along the perimeter, which means that most of the rooms have a free layout with the possibility of easily combining neighboring lots on the site.

Now the second stage of the project is under active construction. In buildings A (a building with apartments), 1 and 2 the monolithic phase is completed, the finishing of the facade work and the installation of engineering systems is coming to an end. In building 3 45% of the monolithic works are finished. The tiles are being laid on the embankment of the “River Park” urban quarter. By the end of October the installation of small architectural forms will start here and in the yards of buildings 1 and 2. The developer of the second phase of the project is OJSC “MSSZ”.

“There is a wide range of lots in the urban quarter “River Park”, – says Natalia Sazonova, development director of the company “Metrium” (member of the CBRE partner network). – Within the first stage the buildings were of comfort class, within the second stage the buyers were offered lots in the buildings of business class. Also in River Park there are apartments and apartments. Thus the developer manages to attract various categories of customers. In particular the apartments are significantly cheaper than the apartments and allow for a smaller amount of money to buy housing of comparable quality.

In the second phase of “River Park” urban quarter realization the minimum price of business class apartments is 7,6 mln. rubles for 34,3 sq. m, apartments – 10,3 mln. rubles for 37,9 sq. m. The buyers can take advantage of mortgage programs from 15 partner banks of the project. It is also possible to buy housing in installments.

24.02.2021
Metal frame in 2 months
Until the object is completed — 19days
24.02.2021
Partnership with the Republic of Belarus
Until the object is completed — 19days
24.02.2021
Ready parking in Balashikha
Until the object is completed — 0days

Video reviews

play
play
play

Other news

24.02.2021
Metal frame in 2 months

The main construction and installation works are completed at the site in Moskovsky.

The installation of the engineering systems and electrical equipment in the parking lot, which is a part of the new residential complex, is coming to the end.

The metal frame of the building, designed by Ferro-Stroy, was assembled in just two months.

24.02.2021
Partnership with the Republic of Belarus

Continued delivery of steel structures to Mogilev of the Republic of Belarus.

The 2nd turn of steel structures is already delivered for the construction of the shopping and entertainment center Park-City in the city of Mogilev of the Republic of Belarus.
The total volume of delivery will amount to 450 tons of steel structures.

The basis of the structural solutions of the trusses of “Molodechno” type using rolled I-beams EVRAZ in both chords of the trusses.

CHARACTERISTICS AND DESIGN SOLUTIONS OF THE BUILDING:

  1. The building has the following dimensions on the plan: -length-84,0 m; -width-30,00 m; the shed has the following dimensions on the plan: -length-84,0 m; -width-13,55 m;
  2. Building operating conditions: – covering design – continuous roll roofing on profiled sheeting; -wall construction of the walls of the type of “Sandwich” with a horizontal layout;
  3. Building volume formed by steel framework load-bearing structures (reinforced concrete columns with ties, floor and roof beams, roof trusses, ties) and the enclosing structures of the coating and walls.
  4. In the transverse direction, the frame is a single-span frame with a rigid coupling of reinforced concrete columns with foundations and articulated connection of the columns with the roof trusses and the attached canopy for the entire length of the building. In the longitudinal direction, the building is a ligamentous frame with rigid reinforced concrete column foundations and hinged support of the steel columns of the framework.
  5. The frame stability is ensured: – in the transverse direction – by the stiffness of the transverse frame; – in the longitudinal direction – by the stiffness of reinforced concrete columns and horizontal connections on the roof and vertical and connections of the columns.
  6. Columns w / b, framing uprights steel.
  7. Covering beams – of welded and rolled I-beams, trusses – of bent welded and rolled profiles.
  8. Gable and single-slope roofing (attached canopy).
24.02.2021
Ready parking in Balashikha

Construction of a multi-level metal-frame open parking for 300 cars was completed in Balashikha, Moscow Region. The total area of the object is 8420m2

Make request
We will implement your project so that the result will bring only positive emotions.

    You agree to the terms of storage and transfer of personal data by submitting an application