PDF презентация

Videos

Metal parking for 530 places
26.02.2021

Watch the video

26.02.2021
Metal parking for 530 places

Video reviews

play
play
play

News

24.02.2021
Metal frame in 2 months

The main construction and installation works are completed at the site in Moskovsky.

The installation of the engineering systems and electrical equipment in the parking lot, which is a part of the new residential complex, is coming to the end.

The metal frame of the building, designed by Ferro-Stroy, was assembled in just two months.

24.02.2021
Partnership with the Republic of Belarus

Continued delivery of steel structures to Mogilev of the Republic of Belarus.

The 2nd turn of steel structures is already delivered for the construction of the shopping and entertainment center Park-City in the city of Mogilev of the Republic of Belarus.
The total volume of delivery will amount to 450 tons of steel structures.

The basis of the structural solutions of the trusses of “Molodechno” type using rolled I-beams EVRAZ in both chords of the trusses.

CHARACTERISTICS AND DESIGN SOLUTIONS OF THE BUILDING:

  1. The building has the following dimensions on the plan: -length-84,0 m; -width-30,00 m; the shed has the following dimensions on the plan: -length-84,0 m; -width-13,55 m;
  2. Building operating conditions: – covering design – continuous roll roofing on profiled sheeting; -wall construction of the walls of the type of “Sandwich” with a horizontal layout;
  3. Building volume formed by steel framework load-bearing structures (reinforced concrete columns with ties, floor and roof beams, roof trusses, ties) and the enclosing structures of the coating and walls.
  4. In the transverse direction, the frame is a single-span frame with a rigid coupling of reinforced concrete columns with foundations and articulated connection of the columns with the roof trusses and the attached canopy for the entire length of the building. In the longitudinal direction, the building is a ligamentous frame with rigid reinforced concrete column foundations and hinged support of the steel columns of the framework.
  5. The frame stability is ensured: – in the transverse direction – by the stiffness of the transverse frame; – in the longitudinal direction – by the stiffness of reinforced concrete columns and horizontal connections on the roof and vertical and connections of the columns.
  6. Columns w / b, framing uprights steel.
  7. Covering beams – of welded and rolled I-beams, trusses – of bent welded and rolled profiles.
  8. Gable and single-slope roofing (attached canopy).
24.02.2021
Ready parking in Balashikha

Construction of a multi-level metal-frame open parking for 300 cars was completed in Balashikha, Moscow Region. The total area of the object is 8420m2

Get the design of the building on a metal frame for free

    You agree to the terms of storage and transfer of personal data by submitting an application.